I'm in the middle of designing a production schedule using Excel.
The idea is to be able to type in the date the uke was started in the first step and have Excel populate all the rest of the steps with the date that each step should be finished by.
Do any of you have any examples of production schedules?
I'm just curious if my target dates are drastically different from how everyone else builds.
~Fred